Lắp ráp đầu xi lanh Weichai 1000873864 – Complete OEM Replacement for WP10, Động cơ Diesel WP12
Maximize engine performance and reliability with the genuine Weichai cylinder head assembly (Số phần: 1000873864) — a fully assembled, precision-engineered core component designed for Weichai’s high-performance diesel engines. This complete cylinder head includes intake and exhaust ports, valve train components (valves, guides, springs), rocker arm stand, fuel injector bore, coolant passages, and sealing surfaces — all pre-assembled and tested to OEM standards.
| Tham số |
Đặc điểm kỹ thuật |
| Tên bộ phận |
Cylinder Head Sub-Assembly |
| Số phần OEM |
1000873864 |
| Brand |
WEICHAI Genuine / OEM Quality Equivalent |
| Ứng dụng |
Combustion chamber & valve train housing |
| Compatible Engines |
WP10, WP12, WP13 series |
| Number of Cylinders |
6-cylinder inline configuration |
| Vật liệu |
High-strength aluminum-silicon alloy with steel inserts |
| Valve Configuration |
2 valves per cylinder (intake & exhaust) |
| Features |
Integrated coolant jackets, fuel injector bore, rocker stand mounts |
| Surface Finish |
Precision-ground mating surface (flatness < 0.05mm) |
| Cân nặng |
Approx. 42–45 kg |
| Gói |
1 x Cylinder Head Assembly (wooden crate with protective film) |
| Sự bảo đảm |
12 months against manufacturing defects |
1. CHÚNG TÔI ĐỐI XỬ VỚI MỌI KHÁCH HÀNG LÀ BẠN CỦA CHÚNG TÔI, BẤM VÀO NGUYÊN TẮC: CHIẾN THẮNG VÀ LỢI ÍCH THƯƠNG MẠI ;
2. NHIỀU SỰ LỰA CHỌN CHO SẢN PHẨM: CHẤT LƯỢNG, NHÃN HIỆU, BAO BÌ;
3. CHÚNG TÔI SẼ TRẢ LỜI BẠN CHO YÊU CẦU CỦA BẠN 24 GIỜ.
4.Nhà cung cấp phụ tùng Perfomance SINOTRUCK chuyên nghiệp
5. CHÚNG TÔI SẼ PHỤC VỤ 24/24 GIỜ TRONG NGÀY LÀM VIỆC.
6. ASS: CHÚNG TÔI SẼ CUNG CẤP CHO BẠN DỊCH VỤ SAU BÁN HÀNG TỐT NHẤT.

Before installing the Weichai cylinder head (1000873864), inspect the engine block surface for warpage or damage. Clean thoroughly and ensure no debris remains in coolant or oil passages. Use a new head gasket and follow the manufacturer’s tightening sequence and torque specification (typically 120 Nm in 3–4 stages). After installation, refill coolant, bleed air, and run the engine at idle first before loading.