MT13 Assemblage du faisceau de câblage Pièce No. 812W25458-6037
MT13 Wiring Harness Assembly (D7B / Lean Burn / NGK / LNG / ECI GROTTLE)
Numéro d'article: 812W25458-6037
Brand: SINOTRUK
Core Function
Le MT13 Wiring Harness Assembly (No de pièce. 812W25458-6037) is a specialized component for SINOTRUK’s LNG-powered lean-burn engines, integrating ECI throttle control et NGK ignition systems. Il assure une transmission précise du signal entre l'ECU, capteurs à combustion maigre, and LNG fuel modules to meet NOx ≤0.3g/kWh et CH₄ ≤1.0g/kWh emission limits under China VI standards.
Principales caractéristiques
- High-Temperature Resilience: Silicone-coated wiring with Aramid fiber shielding, rated for -45°C to 220°C (compatible with LNG cryogenic environments).
- Compatibilité de précision:
- Supports NGK laser spark plugs et ECI electronic throttle valves for adaptive air-fuel ratio control.
- Color-coded connectors (ISO 19642 conforme) for error-free installation on D7B LNG engines.
- Diagnostics: SAE J1939 and CAN FD protocols for real-time monitoring (Par exemple, DTC P0107, P2135 for throttle position errors).
Scénarios d'application
- Vehicle Models: SINOTRUK HOWO TX LNG lean-burn dump trucks, ZZ4257N3247D mining vehicles, and LNG-powered municipal buses.
- Critical Use Cases:
- High-load operations in extreme temperatures (Par exemple, desert mining, Arctic logistics).
- Emission-sensitive urban zones requiring ultra-low NOx/CH₄ output.
1. NOUS TRAITONS CHAQUE CLIENT COMME NOTRE AMI, ADHÉREZ AU PRINCIPE: AVANTAGE GAGNANT ET MUTUEL ;
2. UNE VARIÉTÉ DE CHOIX DE PRODUITS: QUALITÉ, MARQUE, EMBALLAGE;
3. NOUS VOUS RÉPONDRE À VOTRE DEMANDE EN 24 HEURES.
4.Fournisseur de pièces SINOTRUCK de performance professionnelle
5. NOUS SERONS EN SERVICE 24/24 HEURES DE LA JOURNÉE DE TRAVAIL.
6. CUL: NOUS VOUS OFFRIRONS LE MEILLEUR SERVICE APRÈS-VENTE.
