Conjunto de culata Weichai 1000873864 – Complete OEM Replacement for WP10, Motores diésel WP12
Maximize engine performance and reliability with the genuine Weichai cylinder head assembly (Número de parte: 1000873864) — a fully assembled, precision-engineered core component designed for Weichai’s high-performance diesel engines. Este complete cylinder head includes intake and exhaust ports, valve train components (valves, guides, muelles), rocker arm stand, fuel injector bore, coolant passages, and sealing surfaces — all pre-assembled and tested to OEM standards.
| Parámetro |
Especificación |
| Nombre de parte |
Cylinder Head Sub-Assembly |
| Número de pieza OEM |
1000873864 |
| Marca |
WEICHAI Genuine / OEM Quality Equivalent |
| Solicitud |
Combustion chamber & valve train housing |
| Compatible Engines |
WP10, WP12, WP13 series |
| Number of Cylinders |
6-cylinder inline configuration |
| Material |
High-strength aluminum-silicon alloy with steel inserts |
| Valve Configuration |
2 valves per cylinder (consumo & escape) |
| Caracteristicas |
Integrated coolant jackets, fuel injector bore, rocker stand mounts |
| Surface Finish |
Precision-ground mating surface (flatness < 0.05mm) |
| Peso |
Aprox.. 42–45 kg |
| Paquete |
1 x Cylinder Head Assembly (wooden crate with protective film) |
| Garantía |
12 months against manufacturing defects |
1. TRATAMOS A CADA CLIENTE COMO NUESTRO AMIGO, PEGARSE AL PRINCIPIO: BENEFICIO MUTUO Y GANADOR ;
2. UNA VARIEDAD DE ELECCIÓN DE PRODUCTOS: CALIDAD, MARCA, EMBALAJE;
3. LE RESPONDEREMOS SU CONSULTA EN 24 HORAS.
4.Proveedor de piezas de rendimiento profesional SINOTRUCK
5. ESTAREMOS EN SERVICIO 24/24 HORAS DEL DÍA LABORAL.
6. CULO: LE OFRECEMOS EL MEJOR SERVICIO POSTVENTA.

Before installing the Weichai cylinder head (1000873864), inspect the engine block surface for warpage or damage. Clean thoroughly and ensure no debris remains in coolant or oil passages. Use a new head gasket and follow the manufacturer’s tightening sequence and torque specification (typically 120 Nm in 3–4 stages). After installation, refill coolant, bleed air, and run the engine at idle first before loading.