Assemblée de culasse de Weichai 1000873864 – Complete OEM Replacement for WP10, Moteurs diesel WP12
Maximize engine performance and reliability with the genuine Weichai cylinder head assembly (Numéro d'article: 1000873864) — a fully assembled, precision-engineered core component designed for Weichai’s high-performance diesel engines. Ce complete cylinder head includes intake and exhaust ports, valve train components (valves, guides, ressorts), rocker arm stand, fuel injector bore, coolant passages, and sealing surfaces — all pre-assembled and tested to OEM standards.
| Paramètre |
spécification |
| Nom de la pièce |
Cylinder Head Sub-Assembly |
| Numéro de pièce OEM |
1000873864 |
| Marque |
WEICHAI Véritable / Qualité équivalente aux OEM |
| Application |
Combustion chamber & valve train housing |
| Moteurs compatibles |
WP10, WP12, Série WP13 |
| Number of Cylinders |
6-cylinder inline configuration |
| Matériel |
High-strength aluminum-silicon alloy with steel inserts |
| Valve Configuration |
2 valves per cylinder (admission & échappement) |
| Caractéristiques |
Integrated coolant jackets, fuel injector bore, rocker stand mounts |
| Surface Finish |
Precision-ground mating surface (flatness < 0.05mm) |
| Poids |
Environ. 42–45 kg |
| Paquet |
1 x Cylinder Head Assembly (wooden crate with protective film) |
| garantie |
12 mois contre les défauts de fabrication |
1. NOUS TRAITONS CHAQUE CLIENT COMME NOTRE AMI, ADHÉREZ AU PRINCIPE: AVANTAGE GAGNANT ET MUTUEL ;
2. UNE VARIÉTÉ DE CHOIX DE PRODUITS: QUALITÉ, MARQUE, EMBALLAGE;
3. NOUS VOUS RÉPONDRE À VOTRE DEMANDE EN 24 HEURES.
4.Fournisseur de pièces SINOTRUCK de performance professionnelle
5. NOUS SERONS EN SERVICE 24/24 HEURES DE LA JOURNÉE DE TRAVAIL.
6. CUL: NOUS VOUS OFFRIRONS LE MEILLEUR SERVICE APRÈS-VENTE.

Before installing the Weichai cylinder head (1000873864), inspect the engine block surface for warpage or damage. Clean thoroughly and ensure no debris remains in coolant or oil passages. Use a new head gasket and follow the manufacturer’s tightening sequence and torque specification (typically 120 Nm in 3–4 stages). Après l'installation, refill coolant, bleed air, and run the engine at idle first before loading.