Kit d'assemblage d'arbre d'intervalle véritable Sinotruk Howo AZ2203020210 + AZ2203030209 – Pièces de rechange à transmission lourde
Description du produit
Caractéristiques de base
- OEM Matched: Direct replacement for HW19710/12 10-speed transmissions
- Matériel: 20Acier en alliage crmnti avec traitement carburisant (HRC 58-62)
- Précision: 0.01Tolérance au broyage de l'équipement MM (ISO 1328 Classe 6)
Paramètres techniques
spécification |
Valeur |
Poids |
18.5kg ± 2% |
Spline Teeth |
32J (6module MM) |
Bearing Fit |
φ85js6 (+0.011/-0.009mm) |
Compatibilité
- SINOTRUK HOWO T7H/A7 371-420HP models
- Works with 85W-90 GL-5 gear oil
1. NOUS TRAITONS CHAQUE CLIENT COMME NOTRE AMI, ADHÉREZ AU PRINCIPE: AVANTAGE GAGNANT ET MUTUEL ;
2. UNE VARIÉTÉ DE CHOIX DE PRODUITS: QUALITÉ, MARQUE, EMBALLAGE;
3. NOUS VOUS RÉPONDRE À VOTRE DEMANDE EN 24 HEURES.
4.Fournisseur de pièces SINOTRUCK de performance professionnelle
5. NOUS SERONS EN SERVICE 24/24 HEURES DE LA JOURNÉE DE TRAVAIL.
6. CUL: NOUS VOUS OFFRIRONS LE MEILLEUR SERVICE APRÈS-VENTE.

Pre-Installation Requirements
-
Essential Tools
- 200-400Nm digital torque wrench (calibrated within 3 mois)
- Bearing puller set (50-150mm range)
- Dial indicator with 0.001mm resolution
-
Consumables
- LOCTITE 574 flange sealant (100ml tube)
- Mobil SHC Gear 85W-140 lubricant
Installation Process
Step 1: Component Removal
- Drain transmission oil through 28mm hexagonal drain plug (minimum 15min drainage)
- Mark original shim positions with alignment punches (every 45°)
- Remove retaining rings using JIS V-32 circlip pliers
Step 2: Surface Preparation
- Clean mating surfaces with non-chlorinated brake cleaner
- Apply sealant in spiral pattern:
- 3mm continuous bead around bolt holes
- 5mm offset from oil channels
Step 3: Assembly Installation
Component |
Torque Sequence |
spécification |
M12 bolts |
85Nm → 105Nm → 120° angle |
Cross-tightening |
Bearing nuts |
180Nm + 90° Rotation |
Dynamic torque monitoring |
- Verify gear backlash: 0.10-0.15mm (measure at 3 positions 120° apart)
Post-Installation Verification
-
Leak Testing
- Conduct 30min pressure test at 400kPa (max allowable drop: 25kpa)
-
Functional Check
- Run through all gear ranges 50x at 1500rpm
- Monitor temperature rise: ≤65°C after 15min operation
Critical Warnings
- Replace all circlips (mandatory for warranty validation)
- Maintain ambient temperature between 15-35°C during installation
- Initial oil replacement required after 300km break-in period