Ensemble de couvercle latéral de transmission à 10 vitesses Sinotruk AZ2203210040 + 001 – Remplacement lourd pour les camions Howo
Description du produit:
Principales caractéristiques:
- Numéro d'OEM: AZ2203210040 + 001 (Remplacement d'usine direct)
- Matériel: High-strength aluminum alloy with oil-resistant gasket
- Compatibilité: Fits HW19710/HW19712 10-speed transmissions
- Sealing Performance: Résister à une pression de 300kpa (ISO 9001 agréé)
Spécifications techniques:
- Poids: 4.8kg ± 5%
- Motif de boulon: M10 X 1.25 (8-cercle de boulon)
- Température de fonctionnement: -40° C à + 150 ° C
- Includes: Pre-installed oil seal (SKF 62x85x10)
Applications:
- SINOTRUK HOWO A7/T7 series
- Compatible with 10-speed gearboxes using 85W-90 gear oil
1. NOUS TRAITONS CHAQUE CLIENT COMME NOTRE AMI, ADHÉREZ AU PRINCIPE: AVANTAGE GAGNANT ET MUTUEL ;
2. UNE VARIÉTÉ DE CHOIX DE PRODUITS: QUALITÉ, MARQUE, EMBALLAGE;
3. NOUS VOUS RÉPONDRE À VOTRE DEMANDE EN 24 HEURES.
4.Fournisseur de pièces SINOTRUCK de performance professionnelle
5. NOUS SERONS EN SERVICE 24/24 HEURES DE LA JOURNÉE DE TRAVAIL.
6. CUL: NOUS VOUS OFFRIRONS LE MEILLEUR SERVICE APRÈS-VENTE.

Pre-Installation Preparation
-
Required Tools
- SINOTRUK special service tool ST-0987 (cover alignment fixture)
- Torque wrench 10-120Nm range (calibrated within 6 mois)
- Digital depth gauge (0.01mm resolution)
-
Consumables
- ThreeBond 1215 sealing compound (50g tube)
- 10W-30 assembly lubricant (50ml)
Installation Procedure
Step 1: Old Component Removal
- Drain gear oil completely via 24mm drain plug (minimum 45° tilt angle)
- Mark original bolt positions with alignment punch (every 90°)
- Remove circlips using JIS-standard retaining ring pliers
Step 2: Surface Preparation
- Clean mating surfaces with non-woven abrasive pad (120-180 grit)
- Apply sealant in continuous 2mm bead:
- Inner diameter area: 3mm offset from edge
- Bolt holes: full perimeter coverage
Step 3: Assembly Installation
Component |
Torque Spec |
Séquence |
M8 bolts |
25Nm → 35Nm |
Star pattern |
Cover nuts |
50Nm + 15° angle |
Clockwise spiral |
- Verify gasket compression: 0.8-1.2mm (use depth gauge measurement)
Post-Installation Verification
-
Leak Test
- Pressurize system to 250kPa for 10min (maximum 5% pressure drop)
-
Functional Check
- Shift through all gears 20x at 800-1000rpm
- Measure shift effort: ≤28N (cold condition)