ການປະຊຸມດ້ານຂ້າງທີ່ມີຄວາມໄວສູງສຸດ sinotruk 10-Speed az2203210040 + 001 – ການທົດແທນຫນ້າທີ່ຫນັກສໍາລັບລົດບັນທຸກ Howo
ລາຍລະອຽດຂອງສິນຄ້າ:
ລັກສະນະທີ່ສໍາຄັນ:
- OEM Number: AZ2203210040+001 (Direct factory replacement)
- ວັດສະດຸ: High-strength aluminum alloy with oil-resistant gasket
- ຄວາມເຂົ້າກັນໄດ້: Fits HW19710/HW19712 10-speed transmissions
- Sealing Performance: Withstands 300kPa pressure (iso 9001 certified)
ສະເພາະດ້ານວິຊາການ:
- ນໍ້າ ໜັກ: 4.8kg ±5%
- Bolt Pattern: M10 x 1.25 (8-bolt circle)
- Operating Temperature: -40° C ເຖິງ + 150 ° C
- Includes: Pre-installed oil seal (SKF 62x85x10)
Applications:
- SINOTRUK HOWO A7/T7 series
- Compatible with 10-speed gearboxes using 85W-90 gear oil
1. ພວກເຮົາຮັກສາລູກຄ້າທຸກຄົນທີ່ເປັນເພື່ອນຂອງພວກເຮົາ, ຮີບຮ້ອນຕໍ່ຫຼັກການພື້ນຖານ: ເງິນຊ່ວຍເຫຼືອ WIN-WIN ແລະ MUTUAL ;
2. ລາຍລະອຽດຂອງທາງເລືອກ ສຳ ລັບຜະລິດຕະພັນ: ຄຸນນະພາບ, ຍີ່ຫໍ້, ກະເປົ.າ;
3. ພວກເຮົາຈະຕອບແທນທ່ານ ສຳ ລັບຄວາມຕ້ອງການຂອງທ່ານພາຍໃນ 24 ຊົ່ວໂມງ.
4.ຜູ້ສະ ໜອງ ຊິ້ນສ່ວນ SINOTRUCK ທີ່ເປັນມືອາຊີບ
5. ພວກເຮົາຈະຢູ່ໃນການບໍລິການ 24/24 ຊົ່ວໂມງໃນວັນເຮັດວຽກ.
6. ເອສ: ພວກເຮົາຈະສະ ເໜີ ໃຫ້ທ່ານບໍລິການຫລັງການຂາຍທີ່ດີທີ່ສຸດ.

Pre-Installation Preparation
-
Required Tools
- SINOTRUK special service tool ST-0987 (cover alignment fixture)
- Torque wrench 10-120Nm range (calibrated within 6 ເດືອນ)
- Digital depth gauge (0.01mm resolution)
-
Consumables
- ThreeBond 1215 sealing compound (50g tube)
- 10W-30 assembly lubricant (50ml)
Installation Procedure
Step 1: Old Component Removal
- Drain gear oil completely via 24mm drain plug (minimum 45° tilt angle)
- Mark original bolt positions with alignment punch (every 90°)
- Remove circlips using JIS-standard retaining ring pliers
Step 2: Surface Preparation
- Clean mating surfaces with non-woven abrasive pad (120-180 grit)
- Apply sealant in continuous 2mm bead:
- Inner diameter area: 3mm offset from edge
- Bolt holes: full perimeter coverage
Step 3: Assembly Installation
Component |
Torque Spec |
ລໍາດັບ |
M8 bolts |
25Nm → 35Nm |
Star pattern |
Cover nuts |
50Nm + 15° angle |
Clockwise spiral |
- Verify gasket compression: 0.8-1.2ມມ (use depth gauge measurement)
Post-Installation Verification
-
Leak Test
- Pressurize system to 250kPa for 10min (max 5% pressure drop)
-
Functional Check
- Shift through all gears 20x at 800-1000rpm
- Measure shift effort: ≤28N (cold condition)