Genuine Sinotruk HOWO 082V03400-6017 MT07 Cylinder Head Cover Assembly
This authentic Sinotruk HOWO cylinder head cover assembly (No de pièce: 082V03400-6017) is engineered to exact OEM specifications for MT07 series engines, ensuring optimal engine performance and longevity under heavy-duty conditions. Designed to provide a perfect seal between the cylinder head and cover, this assembly prevents oil leaks, maintains compression, and protects internal components from contamination. The reinforced aluminum construction with integrated gasket channels ensures durability and reliable sealing under extreme temperatures and vibrations common in HOWO truck operations. Idéal pour les révisions et la maintenance du moteur, this component is essential for maintaining engine efficiency and preventing costly repairs.
Spécifications techniques:
Matériel: High-grade aluminum alloy (T6 heat-treated) with rubber gasket lining
Dimensions: 890mm × 320mm × 85mm (L × W × H)
Bolt Holes: 18 × M8 threaded holes (torque spec: 12-15 Nm)
Gasket Material: Multi-layer steel with rubber coating
Résistance à la température: -40°C to +220°C continuous operation
Oil Resistance: Compatible with synthetic and mineral engine oils
Cote de pression: Withstands crankcase pressures up to 0.5 bar
Compatibilité: HOWO MT07 series engines (WD615.92, WD615.95 variants)
Poids: 3.2 kg ± 0.1 kg
Norme de fabrication:ISO 9001 agréé, Tolérances OEM
1. NOUS TRAITONS CHAQUE CLIENT COMME NOTRE AMI, ADHÉREZ AU PRINCIPE: AVANTAGE GAGNANT ET MUTUEL ;
2. UNE VARIÉTÉ DE CHOIX DE PRODUITS: QUALITÉ, MARQUE, EMBALLAGE;
3. NOUS VOUS RÉPONDRE À VOTRE DEMANDE EN 24 HEURES.
4.Fournisseur de pièces SINOTRUCK de performance professionnelle
5. NOUS SERONS EN SERVICE 24/24 HEURES DE LA JOURNÉE DE TRAVAIL.
6. CUL: NOUS VOUS OFFRIRONS LE MEILLEUR SERVICE APRÈS-VENTE.

Notes d'installation
Liste de contrôle de pré-installation:
1.Surface Inspection: Verify cylinder head sealing surface flatness (max 0.1mm warpage allowed)
2.Component Cleaning: Ensure both cylinder head and cover surfaces are free of old gasket material and oil residue
3.Bolt Condition: Check all cover bolts for stretching or damage (replace if length exceeds 45mm)
4.Gasket Alignment: Verify gasket alignment pins are intact and properly positioned
Étapes d'installation:
1.Gasket Placement: Position new gasket on cylinder head using alignment pins
2.Cover Positioning: Carefully lower cover onto cylinder head, ensuring no movement disrupts gasket
3.Bolt Torque Sequence: Tighten bolts in three passes using criss-cross pattern:
First pass: 5 Nm
Second pass: 8 Nm
Final pass: 12-15 Nm
4.Crankcase Ventilation: Connect PCV hose and verify clamps are secure
5.Oil Fill: Add engine oil and check for leaks after initial startup
Avertissements critiques:
Never reuse old gaskets or damaged bolts
Avoid silicone sealants unless specified by manufacturer
Verify bolt torque with calibrated torque wrench
Check oil level after installation to prevent dry startup
Post-installation:
Start engine and run at idle for 10 minutes
Inspect for oil leaks around sealing surface
Re-torque bolts after first 500 km d'opération
Monitor oil consumption during initial operation period